Page tree
Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Current »

Note : 
  • Switches for RAVENNA / AES67 must be in managed mode and properly configured.
  • RAVENNA/AES67 network should have its own VLAN and not mixed with other network types.
  • To use several interconnected switches, please also see the Multiple network switches considerations page.



BrandModelPortsRemarks
ArtelQuarra PTP range (StagedBox)8+2SFPPTP aware switchConfiguration Guide
Aruba2930M44+4SFPNot fully tested by Merging, but reported to work on RAVENNA
CiscoSG-300-10 / 208+2 /16 +4 (sfp or copper)
Configuration Guide
CiscoSG-350-108+2 (sfp or copper)
Configuration Guide
CiscoSG-350-10P8+2 (sfp or copper)PoE+ up to 60W (Max 3 Anubis per switch)Configuration Guide
DellPowerConnect 2808/28168 / 16 portsLegacy - discontinuedConfiguration Guide


Not recommended switches:

BrandModelRemarks
DellX1000 seriePoE
DellX1008PPoE (<15.4W)PoE not sufficient for Anubis
ZyxelGS1200-8HPPoEIGMP does not work
UbiquitiUniFi US-8-60WPoENo QoS. Need external software controller, not supported by Merging's support
TP LinkTL-SG108PEPoEPoE may not be sufficient for Anubis. QoS hardcoded.



  • No labels